Factory Locator Ditchwitch Tunnel Horizontal Directional HDD Drilling Rig

YANCHENG LONGTERM MACHINERY CO., LTD. / 2022-06-23

Factory Locator Ditchwitch Tunnel Horizontal Directional HDD Drilling Rig

=== Base Info ===

=== Description ===
ModelYG-160AYG-180YG-280YG-320YG-320AEngine rated power100KW97KW160KW140KW/160KW160KWPush and pullCylinderMotorMotorCylinderMotorMaximum drag/feed force160/100KN180/180KN280/280KN320/320KN320/320KNMaximum torque of power head 5000N.n 6000N.n 10000N.n 12000N.n 12000N.nPower head speed 0-180r/min 0-140r/min 0-120r/min 0-140r/min 0-140r/minMoving speed of power head 30m/min 20m/min 20m/min 20m/min 20m/minMaximum reaming hole diameter Φ600mm Φ600mm Φ750mm Φ800mm Φ800mmDrill rod length (single) 3m 3m 3m 3m 3mDrill pipe diameter Φ60mm Φ60mm Φ73mm Φ73mm Φ73mmDrill pipe diameter 10-23° 10-22° 10-23° 10-20° 10-20°Maximum mud flow 160L/min 250L/min 320L/min 320L/min 320L/minMaximum mud pressure 100bar 80bar 80bar 80bar 80barOverall quality 6700kg 8500kg 12500kg 11500kg 11200kgDimensions (length*width*height)

5700*1820*2400

mm

6400*2270*2340

mm

7100*2260*2450

mm

7100*2250*2450

mm

7662*2162*2450

mm

Feature:

1.Do not obstruct traffic, do not damage the road.
2.High precision, can be turned, the depth can be adjusted at any time, and obstacles can be avoided.
3.City construction will pass three meters, and the river will reach 6-18 meters.
4.The project period is short, the construction personnel are less, it is safer and the cost is lower.

Factory Locator Ditchwitch Tunnel Horizontal Directional HDD Drilling Rig
Factory Locator Ditchwitch Tunnel Horizontal Directional HDD Drilling Rig
Factory Locator Ditchwitch Tunnel Horizontal Directional HDD Drilling RigFactory Locator Ditchwitch Tunnel Horizontal Directional HDD Drilling Rig

1. Packaging:

Packed by standard import & export wooden cases or carton boxes.

2. Shipping:

By logistics; by automobile; by train; by shipping; by air etc.

Factory Locator Ditchwitch Tunnel Horizontal Directional HDD Drilling Rig
Factory Locator Ditchwitch Tunnel Horizontal Directional HDD Drilling Rig
Factory Locator Ditchwitch Tunnel Horizontal Directional HDD Drilling Rig
Factory Locator Ditchwitch Tunnel Horizontal Directional HDD Drilling Rig
1.We have more than15 years manufacture and export experience.
2.Exporting to all over the world,win high reputation among customers.
3.CE, ISO 9001 and Strict Production Guideline to guarantee the high quality of our products.
4.Near the Qingdao port convenient for exporting.
5.Customer service staff 24 hours online,offer free technical support.
6.Factory and Competitive Price we offer.
7.Strong Research & Development technical team.
8.Various machinery to meet all your needs at our factory.
9.Engineers are available to guide the installation and take care of other problems.
10.We offer OEM&ODM service to meet all your requirements. Factory Locator Ditchwitch Tunnel Horizontal Directional HDD Drilling Rig
FAQ
1.Q:
Are you trading company or manufacturer?

A:We are original equipment manufacturer.
2.Q:How long is your delivery time?
A:It is according to the model and quantity.Generally it is 3-5 days if the product are in stock.It will be 15-30 days if you want to customize the product.
3.Q:Do you provide samples? ls it free or extra?
A:Yes,we could offer you the sample.But it's not free.
You need to pay for the sample and the cost of freight.
4.Q:What is your terms of payment?
A:We accept T/T,Westerm Union,Money Gram,Paypal,etc.

Copyright 2024 357th.com All Rights Reserved