Yc-U 1/2 Stainless Steel Union Straight Hydraulic Tube Fittings

Billion Plastic Manufacturing Co., Ltd. Jiangmen / 2022-06-27

Yc-U 1/2 Stainless Steel Union Straight Hydraulic Tube Fittings

  • Pressure:High Pressure
  • Work Temperature:High Temperature

=== Base Info ===

  • Model NO.:YC-U-8
  • Material:Stainless Steel
  • Type:Double Ferrule
  • Technique:Forged
  • Head Code:Hexagon
  • Od Size:1,16′′-2′′
  • Structure:Straight
  • Working Pressure:up to 3000psi or 6000psi or Higher
  • Medium:Water, Oil, Gas
  • Transport Package:Wooden Box, Caton, Plastic Bag
  • Trademark:YC-LOK
  • Origin:Jiangsu, China (Mainland)
  • HS Code:7307290000
  • Production Capacity:10000PCS,Month
  • Package size per unit product:10.00cm * 15.00cm * 15.00cm
  • Gross weight per unit product:0.500kg

=== Description ===
  
Yc-U 1/2 Stainless Steel Union Straight Hydraulic Tube Fittings
Yc-U 1/2 Stainless Steel Union Straight Hydraulic Tube Fittings
Yc-U 1/2 Stainless Steel Union Straight Hydraulic Tube FittingsYc-U 1/2 Stainless Steel Union Straight Hydraulic Tube Fittings
Yc-U 1/2 Stainless Steel Union Straight Hydraulic Tube Fittings
Yc-U 1/2 Stainless Steel Union Straight Hydraulic Tube Fittings




Yc-U 1/2 Stainless Steel Union Straight Hydraulic Tube Fittings

Contact Us:
Jiangsu Yicheng Fluid Equipment Co.,Ltd
Jason Gao

FAQ:


Q1.Can I get free samples?

A: Yes,we can provide you the free sample, but you need to bear their own delivery costs.
 
Q2. Can I have a sample order for fittings?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.


Q3. Are you a trading company or a manufacturer?
 A: We are a manufacturer.

Q4. What is your payment term?
 A:Normally T/T 50% in advance, balance to be paid before delivery.

 Q5: What is your main market?
 A:North America,Greenland,South America,Africa,Southeast Asia, Former Soviet Republics ,East Asia,and Europe.

 Q6:What kind of trade terms can you do?
A:EX-WORKS,FOB,CFR,CIF,etc.

Q7. What about the lead time?
A:Sample needs within 7~15 days, mass production time needs within 20~35 days.

Copyright 2024 357th.com All Rights Reserved