- Condition:New
- Customized:Customized
- Voltage:380V
- Composition:SS304
- Processing Material:Beer
- Process:Boiling
=== Base Info ===
- Model NO.:1000l
- Material:SS304
- Tank Thickness:Inner 3mm Outside :2mm
- Temperature Control:Automatic
- Heating:Gas Steam Generator
- Heat Insulation:Rock Wool Th:80-100mm
- Inner Surface:Pickled and Passivation
- Welding:Argon Arc TIG 100%
- Function:Boiling Wort
- Transport Package:Steel Frame or Wooden Case
- Specification:as customer request
- Trademark:Zunhuang
- Origin:China
- Production Capacity:500piece
=== Description ===
Basic Info.
Model NO.
1000l
Material
SS304
Tank Thickness
Inner 3mm Outside :2mm
Temperature Control
Automatic
Heating
Gas Steam Generator
Heat Insulation
Rock Wool Th:80-100mm
Inner Surface
Pickled and Passivation
Welding
Argon Arc TIG 100%
Function
Boiling Wort
Transport Package
Steel Frame or Wooden Case
Specification
as customer request
Trademark
Zunhuang
Origin
China
Production Capacity
500piece
Product Description
2000L Beer Brewing Equipment List1 | malt milling system | malt miller machine grist case |
2 | Mash system | Mash tank/Boiling tank lauter tank Whirlpool tank Hot water tank Mash/wort/hot water pump Motors Wort oxygenation device Operation platform Plate heat exchanger |
3 | Fermenting system | Beer fermenters Bright beer tanks Yeast adding tank Accessories, such as sample valve, pressure gauge, safety valve and so on |
4 | Cooling system | Ice water tank Refrigerating unit Ice water pump |
5 | CIP cleaning system | disinfection tank & alkali tank &cleaning pump etc. |
6 | Controller | Control system, we have PLC automatic and semi-automatic, the elements brand include LG, Siemens and so on. |
7 | Keg filling system | Keg filling system ( keg washer and keg filler machine), the control system brand is Siemens. |
Inner surface pickled and passivation:
Mash tun inside with agitator:
Lauter tun inside with raker:
Fermentation tank details:
Fermenter cooling method is cooling dribbling with standard parameters, layout and control mode in domestic. Zunhuang companies design and manufacture cooling dribbling according to 0.4-0.5 meters per cubic meter cooling area. And the fermentation tank adopt two-stage cooling refrigerant control mode at the end of the cone and the tank level 10--15cm down. So such design and cooling method to control the flow of the cooling liquid state in fermentation tank by the size of the two-stage cooling refrigerant flow. It will improve heat transfer efficiency and cooling rate, faster cooling, and reduce cooling costs and high economic efficiency equipment commercial operation.
Other Auxiliary Equipment:
1.Malt crusher
2.CIP Cleaning system
3.Control cabinet
4.Cooling system includes glycol tank and chiller unit
Our company introduction:
Shandong Zunhuang Brewing Equipment Co., Ltd, located in Jinan city(China, mainland), is a professional beer equipment, fruit wine equipment manufacturer in China. We could provide the turnkey project for customer, we have regular standard process including Production→ Inspection→ Packing & Shipping→ Installation &Training → After Sales.Our equipment have passed CE and ISO certification and has exported more than 60 countries and regions of the word.Our main markets in Europe, North and South America, Australia and also have projects in Asia, Afria and etc.including the United States, Spain, Canada, Sweden, Denmark, Russia, India, Brazil, and other countries.
Packing and shipping1. Ocean shipment,railway shipment,express delivery.2. No matter flat pack to save shipping cost,or fill with your merchandise into allassembled displays to ship together,all is up to you.3. And we have our own department to arange the shipments.we ship worldwide dierctly by sea,railway or express.we will provide all documents you need to import.4. We packed the goods to meet the transport distance, shock, rust and anti-handling requirements damaged before shipping, to ensure the safe transport of goods to reach the buyer designated location before it is shipped.Our Services:A .Free consultation service before, during, and after sales. B. Project planning and design services.C. Free debugging instruction of equipment until everything is functional. D. Management of equipments' long distance shipping from seller's factory to named port or station by buyer.E.Training of equipment maintenance and operating personally.F. New production techniques. G. Provide 36 months complete warrantee for main parts and life-time maintenance service; The seller is responsible for the nature damage of the machinery in the warranty period except for man-made damage; H.All spare parts and wearing parts are attached with the machinery for free. Certificate: