Carbonated Filling Machine Cola Filling Machine (TL-500)
Changzhou Jian Jin Protective Products Co., Ltd. / 2022-07-05
- Condition:New
- Customized:Customized
- Voltage:380V
- Composition:Filling Machine
- Processing Material:Gravity
- Process:Frozen and Chilled
=== Base Info ===
- Model NO.:CGDF
- Certificate:ISO9001
- Power:by Order
- Processing:Washing Filling Capping
- Control:PLC
- Transport Package:Wooden Case Packing
- Specification:3000-12000bph
- Trademark:Beyond
- Origin:China, Zhangjiagang
- HS Code:8422303090
- Production Capacity:20sets Per Month
=== Description ===
Basic Info.
Model NO.
CGDF
Certificate
ISO9001
Power
by Order
Processing
Washing Filling Capping
Control
PLC
Transport Package
Wooden Case Packing
Specification
3000-12000bph
Trademark
Beyond
Origin
China, Zhangjiagang
HS Code
8422303090
Production Capacity
20sets Per Month
Product Description
Carbonated Filling Machine Cola Filling Machine (TL-500)1)This syrup cooler adopts freon compressor.
2)It could cool down normal temperature syrup at pre-set temperature. Lower temperature from the cooler would be fed into beverage mixer.
3)This is accessory equipments on carbonated drink producing line.
4)This carbonated drinks bottle filling line is used in production gas containing water of PET polyester bottle-packing carbonated beverage, such as Coca cola, Pepsi-cola, Spirit drink etc.
5) The magnetic torque is used for screw capping., in order to assure capping quality.
6) The whole machine designing is reasonable, the appearance is beautiful and the maintenance is convenient.
7) It carries out washing bottle, filling and capping on one machine.
8)The main machine adopts advanced PLC control, Touch screen and no-bottle, no-cap system.
9)Adopting equal pressure filling principle and current spring valves in order to assure beverage quality.
10)It adopts bottle handing technology to make changing bottle more convenient, faster and easier.Model | TL-500 |
Compressor | Total closed |
Volume | 500liters |
Evaporation area | 1.5--2m2 |
Refrigerating | 6000kcal/h |
Temp.of outlet syrup | 0--5degree C |
Power | 3kw |
Overall dimension | 1100x900x2278mm |
Weight | 500kg |
Service Term
1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days . The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.
2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.
Commercial Terms
1. Warranty
All parts are under two Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.
2. Payment
30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sight