Wast Plastic Film Granulating Machine Sj-120

BEHAPPY CRAFTS (SUZHOU) CO., LTD. / 2022-07-04

Wast Plastic Film Granulating Machine Sj-120

=== Base Info ===

=== Description ===

Basic Info.

Model NO. FLZ-120 Computerized Non-Computerized Certification UL, ISO9001:2008, CE Certificate CE, ISO9001 Guarantee One Year Guarantee Output 100kg/H Transport Package Stretch Film or Wooden Case Specification CE, ISO9001 certificate Trademark HOIN Origin Ruian, Zhejiang, China HS Code 8477201000 Production Capacity 30 Set/Month

Product Description

Wast Plastic Film Granulating Machine

1. Characteristics:

The raw materials like waste films of HDPE and LDPE are extruded through the extruder, and then are cooled through wind and cut hotly into granules, featuring in fine quality, bubble free and moisture free.

The machine is equipped with a forced feeder, fast mesh changer and automatic rhermocontroller.

 2. Main consistute of the producing line:a,350 film pulverizer( includes whirlwind feeder system)b, extruder mainframe(includes force feeder device)c, head, hydrulic pressure exchanger filter systemd, hot-cuuting auxiliary engine(includes cutting car, blade system,two paths wind dilivers, filtrate hopper and whirlwind collectere, cold water devicef, frequency inverter (Made in yantai china,  huifeng brand Optional purchase Panisonic brand  g, Notice: the reducer is high-strength hard tooth surface reduction gearbox 
Wast Plastic Film Granulating Machine Sj-120

Wast Plastic Film Granulating Machine Sj-1203. Main Technical Parameter:
ModelFLZ-120
Screw diaΦ120mm
Screw L/D18:1
Screw rotation10-100r/min
Main motor45kw
Max extrusion output135kg/h
Weight3200kg
Dimension4.6*1.5*1.8m
4.Pictures of Machine Details
Wast Plastic Film Granulating Machine Sj-1205.Workshop of HOIN:
High Speed PE Film Blowing Machine for HDPE LDPE LLDPEHigh Speed PE Film Blowing Machine for HDPE LDPE LLDPEHigh Speed PE Film Blowing Machine for HDPE LDPE LLDPE6.More Products Optional:
High Speed PE Film Blowing Machine for HDPE LDPE LLDPE7.After Service of HOIN:
1. How long will your engineer reach to our factory?
Within one week after machine arrival at your factory.
2. How many days will you finish installing?
We will finish installation and training within 15days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's visa, air tickets, hotel, food, and also their salary 100USDper day per person.
4. How long of your machine's warranty period?
Our machines have one year guarantee after finishing installation under normal operation.
5. How could we do after one year warranty period?
We will still offer you our best after service, of course you will afford our technician's cost.
6. How could we do if the parts broken within of after warranty?
We will express the free replacement parts during the warranty date and also send you parts needed by value after warranty.
7. Does your engineer understand English?
Our engineers understand a little English. All of our engineers have rich experience for installingmachines over seven years. In addition, they also can communicate with you using their body language vividly.
8. Can you find us any engineer in our location?
Of course, we will check and inform you as soon as possible.

Copyright 2024 357th.com All Rights Reserved