Huzhou Gu's Imp. & Exp. Co., Ltd. / 2022-07-04
=== Base Info ===
=== Description ===
High Output Plastic Recycling Machine
1. Machine Introduction
Plastic Recycling Machine is suitable for regeneration and granulation of waste plastics, such as HDPE, LDPE and PP etc.
It's equipped with quick motor-operated filter-screen-replacing unit and automatic temperature control.
The granulating crusher uses adjustable speed synchronously.
2. Machine Advantages
1, Screw and barrel is nitrided by 72 hours. 38 chromium materials, it is very hard.
2, Motor with CE standard, more than 10 years life.
3, Hard surface gearbox, the life can be more than 5 years.
4, Electric parts is CHINT, the best supplier in China.
5, The screen changer is by electric controlling, you can choose hydraulic controlling.
6, Water tank is stainless.
3. Machine Parameters
Model | SJ-90C | SJ-100C | SJ-110C | SJ-120C |
Diameter of Screw Stem | 90mm | 100mm | 110mm | 120mm |
L:D | 20:1-22:1 | 20:1-22:1 | 20:1-22:1 | 20:1-22:1 |
Speed of Screw | 10-110rpm | 10-110rpm | 10-110rpm | 10-110rpm |
Main Motor Power | 22kw | 30kw | 30kw | 37kw |
Output | 100kg/h | 120kg/h | 130kg/h | 160kg/h |
Machine Weight | 2t | 2.1t | 2.2t | 2.5t |
Overail Dimensions | 5.8 *1.5* 1.1m | 5.9*1.3*1.2m | 6*1.35*1.3m | 6.2*1.4*1.3m |
4. Machine Details
1,Q: Your factory is trading company or factory?
A: We are factory. We have more 2100 square meter workshop and 23 workers containing
the 2 installment engineer and 1 electric engineer. We are Factory, so we have cost advantage than others
2, Q: How do your company control the machine quality?
A: First we control the raw materials quality.
Second, we control the quality of machine when we are processing.
Third, Our installment engineer will test machine.
3, Q: How about payment term, payment safety and delivery time?
A: We accept 30% deposit, balance before shipment. And Irrevocable L/C at sight.
Delivery time is 20 to 30 days. It is according to order quantity.
4,Q: What is your company after sale service?
A: Our installment engineers are available. Normally it will take about 7 to 10 days for all.
Our guarantee is one year. If there is any spare parts is broken, we can send them freely to you.
You are welcome to contact with us, we will provide excellent quotation and high quality machine
New product
Hot product
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23
2022-06-23