20000 Cubic Meters Per Year Leca Plant Equipment

Qingdao Yuyin Chemical Co., Ltd. / 2022-07-04

20000 Cubic Meters Per Year Leca Plant Equipment

  • Application:Leca Production
  • Certificate:ISO9001,ISO14000
  • Experience:More Than 30 Years
  • Factory Area:55000m2
  • Installation:Under Our Engineer′s Guide
  • After Sale Service:for The Whole Using Life

=== Base Info ===

  • Model NO.:Various Model
  • Design:by Our Professional Engineer
  • Technical Parameters:See Technical Table
  • Output:Can Be Customized
  • Testing:We Offer
  • Transport Package:Standard Export Packing
  • Specification:ISO9001, ISO14000, CE
  • Trademark:ZK
  • Origin:Zhengzhou, Henan, China
  • Production Capacity:Reference to The Form

=== Description ===

High strength
LECA/LESA

600

510 - 600

4.2

7.50

700

610 - 700

5.6

6.00

800

710 - 800

6.4

4.50

900

810 - 900

6.8

4.20

   ModelSpeed(r/min)Slope(%)Capacity(t/d)Power(kw)Weight(t)
Φ1.4×330.39 ~ 3.963251547.5
Φ1.6×360.26 ~ 2.634402252
Φ1.8×450.16 ~ 1.624703078.2
Φ1.9×390.29 ~ 2.934753077.59
Φ2.0×400.23 ~ 2.26310037119.1
Φ2.2×450.21 ~ 2.443.515045128.3
Φ2.5×400.44 ~ 2.443.525055149.61
Φ2.5×540.48 ~ 1.453.530055196.29
Φ2.7×420.10 ~ 1.523.540055198.5
Φ2.8×440.437 ~ 2.183.560055201.58
Φ3.0×480.6 ~ 3.483.5800100237
Φ3.2×500.674 ~ 3.373.51000160252.4
Φ3.5×52.50.6 ~ 3.63.51500180366.5
Φ4×600.396 ~ 3.963.52500315523
Φ4.3×640.4 ~ 3.963.53200420606.69
Φ4.8×720.39 ~ 3.963.55000630853.3
Φ5.2×610.38 ~ 3.793.55500800859
Φ5×80ma×3.5460008001201
Φ5.6×87ma×4.23480008001227.5

6. LECA manufacturing technique
No matter which kind of raw material adopts, the general process are: homogenization of raw materials, granulation, sniter and cooling. According to the classification of raw material, the LECA produce process can be divided into:
6.1. Plastic method: which is suitable for clay and clay raw material, and its process is as follows: clay -plasticizing, homogenizing - granulating - roasting - cooling - finished products. 6.2. Balling method: which is suitable for fly ash or other pulverized raw materials, and its process is as follows: fly ash- homogenizing, balling, granulating - roasting - cooling - finished products. 6.3. Grinding powder into ball method: which is suitable for raw materials of shale, clay shale and coal gangue, and here is the process: drying- grinding - prewetting - granulating - roasting - cooling - finished products, additive. 6.4. Crushing (dry) process: which is suitable for raw materials of shale, and the process is as follows: shale - crashed and classified - roasting - cooling - finished products. 6.5. Fuel: according to the situation of local fuel supply, use bituminous coal, heavy oil or gas.

20000 Cubic Meters Per Year Leca Plant Equipment


7.The Capacity of HANDA LECA production line
Depends on local LECA requirements and capital available, the LECA production line capacity could be 20,000~30,000 m³ per year, 50,000m³per year, 100,000m³ per year.
20000 Cubic Meters Per Year Leca Plant Equipment

Copyright 2024 357th.com All Rights Reserved