WPC PVC Crust/ Celuka Foam Board Sheet Making Extrusion Production Line

Ningbo Conwhole Hardware Co., Ltd. / 2022-07-04

WPC PVC Crust/ Celuka Foam Board Sheet Making Extrusion Production Line

=== Base Info ===

=== Description ===
WPC PVC Crust/ Celuka Foam Board Sheet Making Extrusion Production LineWPC PVC Crust/ Celuka Foam Board Sheet Making Extrusion Production LineAPPLICATION OF PVC/WPC CRUST FOAM BOARD

1. Architecture decoration industry:
Building formwork board, outdoor board, indoor decoration board, residential house board, office board, separation wall of public building, commercial decoration frame, board used in dust-free room, etc.
2. Household decoration:
Bathroom cabinet board, kitchen cabinet board, furniture board, home decoration board, various household shelves, etc.
3. Advertisement industry:
Screen printing, computer engraving, advertisement board, exhibition plate, logo plate, etc.
4. Transportation industry:
Ship, plane, bus, and train, floor covering, core layer, indoors decoration plate, etc.
5. Industrial application:
Suitable for rot-proof project in chemical industry, thermal forming, refrigeration warehouse, etc.

WPC PVC Crust/ Celuka Foam Board Sheet Making Extrusion Production Line

3.Machine List for PVC foam board extrusion line

Namephotos 
SJSZ 80/156 Conical twin Screw Extruder
(ABB frequency converter, SIEMENS conductor, OMRON Japan)
WPC PVC Crust/ Celuka Foam Board Sheet Making Extrusion Production Line
Calibration unitWPC PVC Crust/ Celuka Foam Board Sheet Making Extrusion Production Line
Cooling tank and bracketLength: 6000mm,Trimming knife: 3 sets
Haul-off unitWPC PVC Crust/ Celuka Foam Board Sheet Making Extrusion Production Line
Transverse Cutting unitWPC PVC Crust/ Celuka Foam Board Sheet Making Extrusion Production Line
Auto plate lifterWPC PVC Crust/ Celuka Foam Board Sheet Making Extrusion Production Line
Mould (T-Die)WPC PVC Crust/ Celuka Foam Board Sheet Making Extrusion Production Line

4.Technical Parameter
ModelSJSZ-80
Total installation power(kw)150
Actual electricity consumption(kw)80
Capacity (kgh)500-600
 Line speed (mmin)1-3
Width of board(mm)915mm-1830mm
Thickness(mm)4-30
main Motor Power(kw)75kw 0r 90kw or 110KW


Technical data: 
ModelExtruderWidthThicknessCapcity
TPM-915SISZ80/156915mm<30mm300kg
TPM-1220SISZ80/1561220mm<30mm350kg
TPM-1560SJSZ92/1881560mm<30mm450-500kg
TPM-1830SJSZ92/1881830mm<30mm500-600kg


5.Production Process

PVC powder +additive → mixer →SJSZ series extruder →Coat-hanger type mould →Vacuum calibration cooling platform →cooling rollers and edge-cutting device →Haul off →stacker


6.Auxiliary Machines for your choice
No.Part.Qty.
1SHR-500/1000 Mixer1set
2SWP-400 Crusher1set
3SMP-500 Miller1set
5Water Chiller1set
7.FAQ
1.WHY CHOOSE US
We are the Professional manufacturer to develop the plastic extrusion machines in Qingdao. Machine quality and customer satisfaction is our pursuit.Be sure we have the strength to provide you with quality machines and perfect service.
2.WHAT SERVICES DO WE OFFER?
Pre-sale communication → Design proposal, signature confirmation→Customized production→ Test machine before shipment →Package & delivery→ Engineer installationTraining operator → Technical support
3.PAYMENT TERMS:
30% of total amount should be paid by T/T as down payment ,the balance (70% of total amount) should be paid before delivery by T/T or irrevocable L/C by payment(at sight).
4.DELIVERY CONDITIONS:
4.1 Delivery condition: FOB Qingdao port or CIF destination Port.
4.2 Delivery terms: Within 30-60 working days after receipt of advanced payment, the seller should inform the buyer to do inspection,the seller should finish packing of goods and ready for shipment within 15 working days after the seller receipt the full payment.
5.WARRANTY TERMS
5.1 Warranty period: 12 months, starting from the machine receipt in customer's warehouse
5.2 Seller shall grant: services and spare parts, free-of-charge service throughout the entire equipment during warranty period.
5.3 long life service: the seller should provide long life service for the sold goods, the buyer pay for needed spare parts after the 12months warranty terms.
6.INSPECTION
When the machine finished, the seller should inform the buyer to do inspection before shipment, the seller guaranty good performance of all the sold goods.the seller undertake the material cost for the machine inspection in seller's factory. the buyer should come to seller's factory to do the inspection work, or the buyer could entrust any third party to come to seller's factory to do the inspection work.
7.INSTALLATION AND EQUIPMENT COMMISSIONING:
if the buyer requires, the seller should send technician team to buyer's factory for installation and testing the whole line, and the buyer should undertake the whole food/place and round tickets (airplane, food, hotel, and so on), and pay salary to engineer for 100 usd/day/engineer.


 

Copyright 2024 357th.com All Rights Reserved