=== Base Info ===
=== Description ===
Basic Info.
Model NO.
SJ90x33
Raw Materila
Pet Granule or Pet Flak
Extruder Type
Single Screw Extruder
Inverter Brand
ABB or FUJI
Contactor
Schneider
Components
Siemens
Operator
3-4 Per Line
Oversea Serivice
Available
Screw Material
38crmoaia
Output
200kg/H
Transport Package
In40′ Gp
Specification
ISO, CE
Trademark
Suke
Origin
Qingdao
HS Code
84775900
Production Capacity
50 Sets Per Year
Product Description
PVC Marble Profile Edging Line Extrusion Making Machine MACHINE INTRODUCTION:
Certificate: CE, ISO9001:2008, SGS,
Brand Name: SUKE
This line is used to produce PVC marble profile edging line by twin screw extruder.
This product can be used on skirting panel profile for ceiling, wall panel, background wall, window frame, door frame, skirting board, elevator door frame, etc. special for public and private decoration, such as villa, house, hotel, shopping mall, etc.
PRODUCTION PROCESS FLOW:
Raw materials--- Mixing --- Feeding --- Extruding ---Molding --- Calibrating --- laminating--- Haul-off --- Cutting--- Stacking-- Package.
MACHINE FEATURES:
1. Replace all the real marble, green and environmental friendly, also recyclable.
2. Safety, insulation, flame retardant, corrosion resistance, acid and alkali resistance, 5% acetic acid. 5% hydrochloric acid, no abnormal surface.
3. Leave the flame for five seconds and can self extinguish.
4. Novel color, a variety of colors available for selection, brilliant color natural and vivid color, any spell group shape, highlight the individuality color.
5. Installation convenience, convenient construction sawing, planing, nail, glue free paint.
6. Long service life can reach more than 10 years.
EQUIPMENT LIST:
1. Double Screw Extruder (with screw feeder) 1 unit
2. Mould(T-Die) 1 set
3. Vacuum Calibration Table 1 unit
4. Thermal Printing Machine 1 unit
5. Haul-off Machine 1 unit
6. Cutting Machine 1 unit
7. Stacker 1 unit
Optional Auxiliary Machine;
1. Crusher 1 unit
2. Mixer 1 unit
3. Pulverizer 1 unit
4. Air Compressor 1 unit
TRADE TERMS:
1. Payment Term: 30% for prepayment by T/T, 70% for balanced payment by T/T, or L/C can be acceptable
2. Delivery Time: 40 days after receipt of prepayment.
3. Packing Method: Packing film or wooden case, 1* 40 GP.
4. Guaranteed Time: 12 months
MACHINE TEST AND AFTER SERVICE
1. When machine finished, we will invite client come to our factory to check the machine and do the machine test. If machine is ok, then client pay for the balance. And inspect machine load the container.
2. When machine arrives client's factory, if client needs, we will send 1-2 engineer to client's factory do the machine installation and running test, and also train the local worker how to operate and maintain the machine. It is chargeable.
COMPANY SHOW