PVC WPC Window and Door Profile Making Machine

Ningbo Conwhole Hardware Co., Ltd. / 2022-07-04

PVC WPC Window and Door Profile Making Machine

=== Base Info ===

=== Description ===
The PVC door and window profile production line can choose different specifications of conical twin-screw extruders according to different profile sections and molds, and configure the corresponding vacuum calibration table, tractor, cutting machine, stacker and other auxiliary equipment.
 PVC WPC Window and Door Profile Making Machine 2.Technical Parameter
 

ModelTPM-180TPM-300TPM-600
Max.width of product(mm)180300600
Extruder modelSJSZ-51/105SJSZ-65/132SJSZ-80/156
Extrusion capacity(kg/h)180250350
Motor power(kw)223755
Total length(m)182226
3.Main Composition
 
ItemQuantity
SJSZ- 65 Twin Screw Extruder with Automatic Feeding SystemOne set
Die Mold & Stock MoldOne set
Vacuum Calibrarion TableOne set
Haul-off and Cutter UnitOne set
StackerOne set
Electric Control SystemOne set

4.Work flow and detailed information
 
Feeder• To feed material into extruder; PVC WPC Window and Door Profile Making Machine
Extruder•World famous brand electrical component: Siemens, Schneider, ABB etc; 
• High torque gearbox with adopts NSK/SKF bearing; 
• Siemens motor achieved global after service; 
• Bimetallic screw and barrel; 
• Intelligent PLC controlling system with human-friendly interface. 
PVC WPC Window and Door Profile Making Machine
Die head• 3Cr13/3Cr17 material
• Complete set include extrusion die head, calibrator and cooling tank
PVC WPC Window and Door Profile Making Machine
Calibration table• Include full set of vacuum and water pump
• Width: 240mm
• Length: 6000mm
• Independent operation panel for easy operation
PVC WPC Window and Door Profile Making Machine
Haul off• Upper/lower caterpillar driven separately and speed control by inverter
• Fast change type pads for easy operation
PVC WPC Window and Door Profile Making Machine
Cutter• Lifting saw cutter with adopts double station dust collection system
•Synchronous driving by air cylinder or servo motor control
PVC WPC Window and Door Profile Making Machine
Stacker• Stainless steel304 as touching material
• Discharge driving by air cylinder
PVC WPC Window and Door Profile Making Machine

5.About us

Qingdao Trusty Plastic Machinery Co., Ltd. is a professional plastic extrusion equipment manufacturer integrating design, research and development, production and sales.
The company's main products are rich, the production technology is mature, and the after-sales service is guaranteed. Products are sold at home and abroad, such as: Brazil, Chile, Mexico, the Philippines, Italy, Russia, Pakistan, Vietnam, India, Algeria, Egypt and other countries.

Our company is located in Qingdao, one of the plastic machinery bases in China, where the railway, sea transportation, aviation and other transportation systems are very complete. And it is one of the regions with rapid economic development in the coastal cities.The advantaged geographical conditions have provided great convenience for the development of the company's trade.

Our company's main products are: PVC door and window profile production line, WPC wood-plastic profile production line, PVC wall panel production line, PVC/PE/PPR pipe production line, PVC/WPC crust foam board production line, PE/PP/PC hollow sheet production line, PVC roof tile production line and PET packing belt production line, etc. According to customers' needs, to achieve diversified processing customization.

Over the years, the company has always adhered to the tenet of "honesty for basis, quality for living, innovation as the theme, and development as the focus", abide by the quality commitment to users, and won the trust of customers.



6.FAQ

1.WHY CHOOSE US
We are the Professional manufacturer to develop the plastic extrusion machines in Qingdao. Machine quality and customer satisfaction is our pursuit.Be sure we have the strength to provide you with quality machines and perfect service.

2.WHAT SERVICES DO WE OFFER?
Pre-sale communication  Design proposal, signature confirmation
Customized production Test machine before shipment Package &
delivery Engineer installationTraining operator  Technical support

3.PAYMENT TERMS:
30% of total amount should be paid by T/T as down payment ,the balance (70% of total amount) should be paid before delivery by T/T or irrevocable L/C by payment(at sight).

4.DELIVERY CONDITIONS:
4.1 Delivery condition: FOB Qingdao port or CIF destination Port.
4.2 Delivery terms: Within 30-60 working days after receipt of advanced payment, the seller should inform the buyer to do inspection,the seller should finish packing of goods and ready for shipment within 15 working days after the seller receipt the full payment.

5.WARRANTY TERMS
5.1 Warranty period: 12 months, starting from the machine receipt in customer's warehouse
5.2 Seller shall grant: services and spare parts, free-of-charge service throughout the entire equipment during warranty period.
5.3 long life service: the seller should provide long life service for the sold goods, the buyer pay for needed spare parts after the 12months warranty terms.

6.INSPECTION
When the machine finished, the seller should inform the buyer to do inspection before shipment, the seller guaranty good performance of all the sold goods.the seller undertake the material cost for the machine inspection in seller's factory. the buyer should come to seller's factory to do the inspection work, or the buyer could entrust any third party to come to seller's factory to do the inspection work.
7.INSTALLATION AND EQUIPMENT COMMISSIONING:
if the buyer requires, the seller should send technician team to buyer's factory for installation and testing the whole line, and the buyer should undertake the whole food/place and round tickets (airplane, food, hotel, and so on), and pay salary to engineer for 100 usd/day/engineer.

7.After sales service
 
Technical documentation
All symbols on the equipment will be in English. We will be responsible for providing the Buyer with a general layout plan, electrical plan, installation orientation and manuals, in English.
Arrangements for inspection, installation and testing of the equipment
a. After all of the equipment is delivered to the customer's factory, the Buyer shall be responsible for all preparation work, e.g. electricity supply, water supply, cranes and labor, etc.
b. We will prepare visa applications for their engineers, who will assist in the equipment installation and testing at the Buyer's factory.  
c. The Buyer will buy a round-trip air ticket for the engineer(s) after the visa application is approved. The Buyer is responsible for all expenses generated, e.g. visa application fees, meals, accommodation and an allowance of $80.00 per day for each engineer.
d. The engineer(s) will provide free training for the operators and maintenance people, in Buyer's factory.
e. If the Buyer does not request commissioning by our engineer(s) within four months from the date of the bill of lading, it will be accepted that all the equipment has been successfully tested and approved by the Buyer.
Quantity and quality guarantee
a. In cases of quantity discrepancies or equipment damage, at the destination, the Buyer will file a claim within 30 days after the arrival of the goods at its destination. The insurance company and the shipping company will be responsible for all discrepancies and damage caused by the shipping company or other transportation companies. 
b. Guarantee period and after-sales services: 13 months from the date of the bill of lading.
During this guarantee period, if there is a quality issue, we will provide spare parts without charge. If malfunctions are caused by the Buyer's improper operation of equipment, we will provide the Buyer with spare parts at cost prices. 
c. Long-term service:
Beyond one year, we will provide the Buyer with spare parts at reasonable prices and provide long-term technical guidance.

PVC WPC Window and Door Profile Making Machine
PVC WPC Window and Door Profile Making Machine

Copyright 2024 357th.com All Rights Reserved