Brand New Slipper Pcu PVC Air-Blow Injection Moulding Shoe Machine

Giant Lift Co., Ltd. / 2022-07-04

Brand New Slipper Pcu PVC Air-Blow Injection Moulding Shoe Machine

=== Base Info ===

=== Description ===
ItemUnitParameterRaw material PVC.TPRWork StationsStations24Mould-clamping PressureKg70000Space to hold mouldMm (LxWxH)400*200*220 / 600*280*230Diameter of ScrewMm60Max. Injection VolumeCm3758 / 785Injection PressureKg/cm2550Diameter of Discm3.60Temperature Control SectionSections4Electric Heating Energy of Material tubeKw8.78 / 9.18MotorKw/Hp18.5/25 Total Electricity Consumptionkw29Machine Size mm6200*3530*2300OutputPairs/day2500Machine Weightkg8800Data are not binding and may be changed without prior notice.Brand New Slipper Pcu PVC Air-Blow Injection Moulding Shoe MachineBrand New Slipper Pcu PVC Air-Blow Injection Moulding Shoe MachineBrand New Slipper Pcu PVC Air-Blow Injection Moulding Shoe MachineBrand New Slipper Pcu PVC Air-Blow Injection Moulding Shoe MachineBrand New Slipper Pcu PVC Air-Blow Injection Moulding Shoe MachineBrand New Slipper Pcu PVC Air-Blow Injection Moulding Shoe Machine
1 most of mechanical movements, covering ranges from injection, feeding, disc-rotating to mould-clamping, could be inputted into PLC, which ensures more accuracy for mechanical movements. 
2 equipped with digital-type proportional controller so as to control mould-clamping pressure, injection pressure and feeding pressure. 
3 unique mechanical structure, which allows to place big mould in size; at the same time, the machine is fitted with mould cooling device which is easy to operate, producing product more perfectly.
4 with the help of blowing system, the machine can have product lightweight, soft and own a polished looking in surface. Besides, the weight can be 20%-30% lower than traditional production way.
5 recycled material can be mixed together to produce products, quality of which can be comparable with new product made of purely new material.

FAQ
 
Delivery date:
Within 25 days After receiving the 30% earnest money.
 
Payment term: 
Advance payment at order 30%, 70% before shipment
 
Delivery State: 
Machines were taken apart and packed in suitable package that fits container shipping
 
For the machine experiment and installation, our technician will be sent to your 
factory. And you are requested to afford the cost of their trip and payment .
Our technician will manage all the machine things for you and at the same time   train  your  workers on 
how  to use  and maintain the machine.
 
Guarantee Time: 
One-year warranty and lifelong service.  During guarantee period, the cost of any spare parts or new accessory should be borne by the seller, and the freight for delivery of spare parts will be on the buyer's account.


Brand New Slipper Pcu PVC Air-Blow Injection Moulding Shoe Machine

Copyright 2024 357th.com All Rights Reserved